June 6, 2023 5:47 pm Published by admin OM Dean required an 110″ 2×2 video wall solution in their corporate boardroom at their Worcester,MA facility. The room incorporated an LG 110″ dia. video wall with a matrix switching processor, Crown amplifier and in-ceiling speakers. Also integrated an Intel NUC, MSDisplay adapter source, and wired table hdmi connections for impressive presentation options.
June 6, 2023 5:33 pm Published by admin MAIA required a hybrid conferencing solution in their offices in Milford,MA. The room incorporated in-ceiling ClearOne mic arrays with in-ceiling speakers. Also integrated a ClearOne Interact Pro system, and a PTZOptics 20x tracking camera integrated to facilitate Zoom, Teams, Webex etc. conferencing. Also added a Sony laser projector to complement the new system.
June 6, 2023 5:24 pm Published by admin Keches Law Group required several Zoom conference room configurations in their offices in Worcester,MA Lawrence, MA. and Bridgewater,MA. The rooms incorporated in-ceiling YeaLink mic arrays with in-ceiling speakers. Also included a 55″ Interactive Vibe board, and YeaLink PTZ cameras integrated to facilitate Zoom, Teams, Webex etc. conferencing.
May 4, 2022 6:20 pm Published by admin Health Center Central MA required an Executive Boardroom configuration in their corporate facility in Worcester,MA. The room incorporated in-ceiling ClearOne mic arrays with in-ceiling speakers. Also included a ClearOne Interact Pro DSP, Crown amplifier, Aver PTZ camera integrated to their Christie Digital projector to facilitate Zoom conferencing.
October 5, 2021 3:07 pm Published by admin The Samuel Slater Museum required two interactive classrooms in Webster,MA to accommodate local school’s visiting field trips. The room incorporated an Epson Short-throw laser projector, 6 ft. whiteboard, and an on-wall controller.
October 5, 2021 3:03 pm Published by admin Moderna required an Executive Boardroom and 2 Huddleroom configurations in their corporate facilities in Cambridge,MA. The room incorporated in-ceiling ClearOne mic arrays with in-ceiling speakers. Also included a ClearOne Interact Pro DSP, Crown amplifier, Aver PTZ camera and an 75″ Sony XBR monitor to facilitate Zoom conferencing.
September 28, 2021 11:51 am Published by admin Bethany Catholic Health Center required an Executive Boardroom configuration in their corporate health facility in Framingham,MA. The room incorporated in-ceiling ClearOne mic arrays with in-ceiling speakers. Also included a ClearOne Interact Pro DSP, Crown amplifier, Aver PTZ camera and an 86″ Sony XBR monitor to facilitate Zoom conferencing.
September 28, 2021 11:07 am Published by admin Emuge Corporation required a Sony laser ceiling projector configuration in their corporate training facility in West Boylston,MA. The front wall incorporated an in-ceiling 135″ dia. drop-down Da-Lite screen.
September 28, 2021 11:01 am Published by admin AV Integrators partners with the Seven Hills Foundation to design and maintain their facilities at various locations around the state. We have designed and installed Zoom conferencing solutions at their corporate location in Worcester and at their Children’s Friend location.
April 10, 2020 12:31 pm Published by admin AV Integrators designed and installed a complete AV solution for the Roney Funeral Home in Grafton,MA. We have also serviced Nordgrens Funeral Home in Worcester and the Mulhane Funeral Home in Milford.