September 12, 2024 7:47 pm Published by Rick Executive Boardroom AV Upgrade for Eden Rafferty Legal in Worcester, MA Project Summary Eden Rafferty Legal in Worcester, MA required a design & installation for their Executive boardroom on Shrewsbury Street. This project included an 85 in. Sony monitor, 2 – Yealink AI PTZ cameras, VCM38 in-ceiling mics, 2 MSSpeakerII conferencing speakers, and an Intel [...]
August 14, 2024 1:41 pm Published by Rick Yealink Conference Room Installation at MOC in Fitchburg, MA Project Summary AVI designed and installed a state-of-the-art Yealink Conference Room at MOC’s Fitchburg, MA location. The project included cutting-edge audiovisual technology to support seamless communication and collaboration. This installation equips MOC with advanced tools for efficient meetings, whether in-person or virtual. Project Details Enhanced Collaboration [...]
June 26, 2024 9:51 pm Published by Rick Comprehensive AV Installation at Seven Hills Southbridge Campus Project Summary AVI designed and installed two Yealink Training Rooms, an Observation Room, and Biamp Sound Masking throughout the entire 3rd Floor of Seven Hills Southbridge Campus at 7 Optical Drive. Additionally, custom signage was installed in the main lobby and upstairs waiting room, enhancing navigation and [...]
June 26, 2024 2:12 pm Published by Rick AVI designed & installed Hyde Tools new Training Room Teams conferencing system located in Southbridge, MA. This system included a ClearOne Interact Pro, ClearOne In-Ceiling Mic arrays, and 6 in-ceiling speakers. All video sources ran through a 4×4 HDMI matrix switch allowing any source displayed out to any display which included an Epson 520U 5000 [...]
June 26, 2024 2:03 pm Published by Rick Conference Room AV Upgrade for DRB Facilities Services in Boston, MA Project Summary DRB Facilities Services at Copley Place needed two conferencing rooms upgraded at their location in Boston MA. We installed new Yealink A30/Touch Panel AI Meetingbars for their two Zoom Rooms which provided them with total speaker tracking/auto framing capabilities. Project Details The [...]
June 26, 2024 1:55 pm Published by Rick A long-time client, Currie Consultants, required an equipment move from the Shore Drive location in Worcester to a new Lincoln St. office. We moved two conferencing systems and re-installed them at their new office.
June 24, 2024 1:37 pm Published by Rick Unilock in Uxbridge, MA required a new laser projector installed in their All-Hands are. We assisted by installing a Sony Laser VPL520U 5000 lumen in the space which greatly enhanced their meeting presentation capabilities.