
February 6th, 2025
Yealink Conference Room Installations at public library in Boylston, MA
Project Summary
AVI designed and installed two state-of-the-art Yealink Conference Room solutions at Boylston’s public library location. The project…
February 6th, 2025
Yealink Conference Room Installations at public library in Boylston, MA
Project Summary
AVI designed and installed two state-of-the-art Yealink Conference Room solutions at Boylston’s public library location. The project…
September 12th, 2024
Executive Boardroom AV Upgrade for Eden Rafferty Legal in Worcester, MA
Project Summary
Eden Rafferty Legal in Worcester, MA required a design & installation for their Executive boardroom on Shrewsbury Street. This project included an 85 in….
August 14th, 2024
Yealink Conference Room Installation at MOC in Fitchburg, MA
Project Summary
AVI designed and installed a state-of-the-art Yealink Conference Room at MOC’s Fitchburg, MA location. The project included cutting-edge audiovisual…
June 26th, 2024
Comprehensive AV Installation at Seven Hills Southbridge Campus
Project Summary
AVI designed and installed two Yealink Training Rooms, an Observation Room, and Biamp Sound Masking throughout the entire 3rd Floor of Seven Hills…
Project Summary
AVI designed and installed a comprehensive Teams conferencing system for Hyde Tools’ Training Room in Southbridge, MA. The system includes a ClearOne Interact Pro, ClearOne In-Ceiling Mic arrays, six in-ceiling speakers,…
Conference Room AV Upgrade for DRB Facilities Services in Boston, MA
Project Summary
DRB Facilities Services at Copley Place needed two conferencing rooms upgraded at their location in Boston MA. We installed new Yealink A30/Touch Panel…
Project Summary
A long-time client, Currie Consultants, required an equipment move from the Shore Drive location in Worcester to their new Lincoln St. office. We relocated and re-installed two conferencing systems, ensuring seamless…
June 24th, 2024
Unilock in Uxbridge, MA required a new laser projector installed in their All-Hands are. We assisted by installing a Sony Laser VPL520U 5000 lumen in the space which greatly enhanced their meeting presentation capabilities.
June 6th, 2023
OM Dean required an 110″ 2×2 video wall solution in their corporate boardroom at their Worcester,MA facility. The room incorporated an LG 110″ dia. video wall with a matrix switching processor, Crown amplifier and in-ceiling speakers. Also…
MAIA required a hybrid conferencing solution in their offices in Milford,MA. The room incorporated in-ceiling ClearOne mic arrays with in-ceiling speakers. Also integrated a ClearOne Interact Pro system, and a PTZOptics 20x tracking camera…