
Divisible Partitioned Room Installation at Seven Hills Hope Ave Corporate Campus Project Summary AVI designed and installed a partitioned Yealink Training Room, in first floor of the of the Seven Hills Worcester Corporate Campus...
Read Article
Divisible Partitioned Room Installation at Seven Hills Hope Ave Corporate Campus Project Summary AVI designed and installed a partitioned Yealink Training Room, in first floor of the of the Seven Hills Worcester Corporate Campus...
Read Article
Yealink Conference Room Installations at public library in Boylston, MA Project Summary AVI designed and installed two state-of-the-art Yealink Conference Room solutions at Boylston's public library location. The project...
Read Article
Executive Boardroom AV Upgrade for Eden Rafferty Legal in Worcester, MA Project Summary Eden Rafferty Legal in Worcester, MA required a design & installation for their Executive boardroom on Shrewsbury Street. This project included an 85 in....
Read Article
Yealink Conference Room Installation at MOC in Fitchburg, MA Project Summary AVI designed and installed a state-of-the-art Yealink Conference Room at MOC's Fitchburg, MA location. The project included cutting-edge audiovisual...
Read Article
Comprehensive AV Installation at Seven Hills Southbridge Campus Project Summary AVI designed and installed two Yealink Training Rooms, an Observation Room, and Biamp Sound Masking throughout the entire 3rd Floor of Seven Hills...
Read Article
Project Summary AVI designed and installed a comprehensive Teams conferencing system for Hyde Tools' Training Room in Southbridge, MA. The system includes a ClearOne Interact Pro, ClearOne In-Ceiling Mic arrays, six in-ceiling speakers,...
Read Article
Conference Room AV Upgrade for DRB Facilities Services in Boston, MA Project Summary DRB Facilities Services at Copley Place needed two conferencing rooms upgraded at their location in Boston MA. We installed new Yealink A30/Touch Panel...
Read Article
Project Summary A long-time client, Currie Consultants, required an equipment move from the Shore Drive location in Worcester to their new Lincoln St. office. We relocated and re-installed two conferencing systems, ensuring seamless...
Read Article